1.
Faris Djunaedy M, Isa Irawan M. Optimization of the Duration of a Steam Power Plant Overhaul Project Using Resource-Constrained Critical Path Method (RCPM)-Based Scheduling. jrssem [Internet]. 2026 Aug. 21 [cited 2026 Oct. 9];6(1):452-70. Available from: http://www.jrssem.publikasiindonesia.id.solusipublish.com/index.php/jrssem/article/view/1663