Navigating Indonesia’s Utility-Scale Solar Program: A Strategic Management Perspective on PLN
DOI:
https://doi.org/10.59141/jrssem.v6i2.1727Keywords:
strategic management, utility-scale solar, pt pln (persero), swot-tows, vrioAbstract
Indonesia’s transition toward a renewable-based electricity system has positioned PT PLN (Persero) at the center of an ambitious utility-scale solar program mandated by the Electricity Supply Business Plan (Rencana Usaha Penyediaan Tenaga Listrik [RUPTL]) 2025–2034. The program targets an increase in solar and wind capacity from 5 GW to 27 GW by 2034, contributing to the broader national target of 100 GW of solar power capacity. This study conducted a qualitative strategic analysis of PLN’s readiness to implement the program using the Strategic Management Process framework developed by Hitt, Ireland, and Hoskisson. Data were collected through document analysis of government regulations, PLN corporate and sustainability reports, and strategic planning documents, complemented by primary insights obtained through discussions with PLN personnel involved in renewable energy planning, investment, and corporate strategy. External analysis using PESTEL, Porter’s Five Forces, and competitor analysis indicated a policy environment that strongly supports solar deployment but remains constrained by high capital requirements, a concentrated global supplier base, and limited domestic manufacturing capacity. Internal analysis using the Resource-Based View (RBV), VRIO framework, and value chain analysis identified four sustainable core competencies: corporate and national strategic planning; electricity system planning and renewable energy integration; transmission and distribution operations; and stakeholder, regulatory, and partnership management. The SWOT–TOWS synthesis generated twelve strategic initiatives across four strategic quadrants. At the corporate level, PLN is recommended to pursue a related constrained diversification strategy supported by shared land resources, financing capabilities, and engineering activities across PLN Holding and its generation subsidiaries.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Anna Maria Josephine Simatupang, Harimukti Wandebori

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.